EcoLapagos Report

 
 

Photos

 
   

SATURDAY MORNING

The solar array is installed on the roof of a concrete building which is located in the southern corner of CNG's property.

SATURDAY MORNING

Back view of the PV array from ground level. The structure has an inclination of about 10 degrees facing north.

SATURDAY MORNING

The combinar box for Array B is in place. The box is combining in parallel 5 sets of 4 panels in series per set.

SATURDAY MORNING

Likewise, the combiner box for Array A is also combining 5 sets of 4 panels each. Both boxes have an identical configuration of elements.

SATURDAY MORNING

The power lines from Array A and B run inside the black pipe lying on top of the roof.

SATURDAY MORNING

The re-wiring and re-configuration of the photovoltaic array has been completed.

SATURDAY MORNING

Junction box in the back of one panel that ilustrates the series connections that were implemented.

SATURDAY MORNING

One set of 4 panels connected in series. Notice the ground wires interconnecting the panel's frames.

SATURDAY MORNING

This perspective shows the conduit used to run the wires from each set to the combiner box.

SATURDAY MORNING

The metallic structure was also used to support the conduit to run the cables for the series connections to the combiner boxes.

SATURDAY MORNING

Another perspective of combiner box for Array B

SATURDAY MORNING

Close-up picture of conduit attached to the structure.

SATURDAY AFTERNOON

Each saturday we we also organized a BBQ in the patio of the school that gave us the chance to meet each other a little bit more.

SATURDAY AFTERNOON

After the BBQ we continued working. Enrique Torres is installing the AC breaker box for the new system.

SATURDAY AFTERNOON

Luis Rosero and Enrique are mounting one inverter to the wall. It weights 55 pounds.

SATURDAY AFTERNOON

Enrique is done with the first out of two inverters, and the AC box. It remains to be mounted the DC breaker box and the two charge controllers.

SATURDAY AFTERNOON

Luis and Enrique are tightening the last bolts to hold the inverters and the breaker boxes.

SATURDAY AFTERNOON

To the left is the DC breaker box, two Outback FX-2548 inverters and the AC breaker box to the right. The autotransformer is mounted inside the AC breaker box.

SATURDAY AFTERNOON

The achievements of the day: Completion of photovoltaic array re-wiring and mounting of main electronic components in the control room.